What is maximum demand and contract demand?

Answer Posted / harsh patel

Contract demand is the total power (KW or KVA) required by the customers and written agreement done with supplier.while maximum demand is the peak load recorded for intervals of some particular time such as 15 minute or 30 minute.

Is This Answer Correct ?    2 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What are the types of power in electrical power?

714


I have a 380 KVA DG set. How can i find out 1. My Fuel Consumption per hr ? 2. Electricity produced in 1 Hr. ? 3. If load varies then how does it affect fuel consumption & electricity produced ? Please HELP !!! Really need an answer.

2113


how to calculate the surge level of surge suppressors related to the SF6 cicuit breakers?

1544


could anybody able 2 send me jindal steels previous papers fr electrical steam....pls send 2 my id if possible....sirisha.shaik@gmail.com

1574


What are n circles?

666






In case of generator when we consume more power produces by it why load on generator increase and starts sound more. and how it is adjusted..

1423


What is the lower limit of break-down voltage of converter transformer.

1447


sir my exam is on 19/6/2013 under electrical branch pls send me sample aptitude questions as well as sample technical questions for jindal steel and power company

1748


what is an unbalance in acircuit? in a three phase 3wire circuit how an unbalance will come? in a three phase four wire system how an un balance is coming?

1341


What is clock position of Transformer?what are the clock positions are there?and what is different of them?

2608


we are having 15kw and 3kw motor both can run in same time , instead of using copper we are using ug aluminium cable , 35 sq.mm is suitable for its current carrying capacity..?

1310


A commercial Building is designed with 14th floor levels with indoor substation of three phase transformer with rated capacity of 1000 Kva.The transformer delivered 65% of its rated capacity at 0.67 power factor lagging.Because of low power factor, the power customer was penalized and certain cost was charged accordingly based on every point percentage lower than 85%.This situation may repeatedly happen on the succeding energy bills of power customer.The power customer is desired to improve its historical power factor of 0.67 lagging and no further penalty be impose by the local power company on the next bill. Q: Identify the appropriate solution you want to offer to Client?.Justify SCIENTIFICALLY and MATHEMATICALLY the principles behind the solution.

1337


In EHV transmission line a neutral grounding reactor is often placed at neutral point of shunt reactors. What is the recommended protection for this neutral grounding reactor? Should I use a fast closing switch to bypass neutral grounding reactor when this protection operates?

2747


State thevenin’s theorem?

656


Write the analogous electrical elements in force current analogy for the elements of mechanical translational system.

753