What are the different ratings of the fuse units for
different distributions at your organization?

Answer Posted / srinivas0699

2,4,6,10,16,25,32,50,63,80,100,125,160,200,250,315,400,630,800

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How can we calculate ac current from the given DC current when AC voltage is given?

1529


What Should be the value of Vector Surge angle at Tripping and how to calculate it?

1587


a 100mva,400/200v transformer has leakage impdce of 10% draws a steady state line currentof---------------

1461


What is the difference b/w fanuc alpha series 16i and 18i controller. what is stand for i

1590


what is load despatching

1667






Explain the method to keep noises low in a control system?

653


why swityard is necessrry requirement in any bis power distributin systems?

1885


in wind mill use 2100 kw asychronous generator ( induction generator ) rotor voltage : 3300,stator voltage : 690, rpm : 1511 type : MRL063E04 ' we check rotor resistance magger value found following. R-EARTH - 00 M.OHM,Y-EARTH-34 M.OHM,B-EARTH- 33M.OHM R-Y: 31 M.OHM, Y-B: 00 M.OHM,B-R :33 M.OHM HOW CAN I TAKE DECISION?pls ans. quickly

1878


hai iam arunkumar. i have applied for an section enginner in rrb. i want lat 5 years solved question papers. if u have please sedn it to arun30682@gmail.com

1309


can we use CBCT in neutral of solidly grounded transformer? in place of three phases we can pass only one phase which decreases the size of CBCT?

1766


What is an automatic controller?

646


Types of test in Switchgears, MCC, NGR and DB's how it should be procced. Can anyone give me the details here or email me to pasuvaraj.k@gmail.com

1623


We are preparing another project which involves Waste heat recovery from a 1 MW GE Engine. The Engine in particular gives out flue gas at 487Deg C with a flow rate of 5650 kg/hour and this can be cooled to 180 Deg C. This gives a thermal output of ~ 594 KW that is available for input to VAM via heat exchanger / boiler. Additionally 581 KW will be available from engine jacket water (temperature profile 80/ 80 Deg C and a flow rate of 50m3/hr) Our estimation is that 300 TR of cooling is possible with a suitable VAM machine(s). Please advise what is the most suitable arrangement with maximum TR and min Capital expenditure. plz reply me as early as possible

1499


what is the total power generation in india?

1713


In convertor can we use rectifier thyristor in place of invertor thyristor with explain.

1380