how to decide cement quantity in 1 m3 concrete
Answer Posted / mehar
For example take m15 grade of concrete.. It's ratio 1:2:4
1+2+4 =7
So cement having 1 m3 wet volume.
But dry vol= wet volume x1. 54 m3(45-55 % of dry volume)
Wt of cement =(1x1.54x1440) /7 = 312kg
Convert to bags = 312/50 = 6.25 bags
So for 1m3 of concrete work of m15 grade comcrete nearly 6.5 bags of cement if required..
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
sir please send me campus placement questions in civil engineering
What is missing report and how to prepare
How to calculate chejja reinforcement
Types of column foundation and how to calculate its steel quantity.
Can someone please be curing period of the following according to IS codes Column beam slab brick masonry raft found. and also tell how many hours/day
How can I make justification between using concrete grade c35 compare c37?
how much cement and sand required for 100sqm of wall plastering in different proportions
what course did you consider thinking before you enrolled in college?
hai, kindly send anyone for output workers format details for construction project in foundation to finishing.
Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.
Caching, Multithreading and RAMBUS are 3 methods for resolving the Bottleneck problem. Please give an explanation for each one (how are they resolve the problem?)
Define mirror?
detailed calculation of the amount of cement used?
How to find out kg per Sft ?
Why is the statue of liberty made of copper?