how to decide cement quantity in 1 m3 concrete
Answer Posted / mehar
For example take m15 grade of concrete.. It's ratio 1:2:4
1+2+4 =7
So cement having 1 m3 wet volume.
But dry vol= wet volume x1. 54 m3(45-55 % of dry volume)
Wt of cement =(1x1.54x1440) /7 = 312kg
Convert to bags = 312/50 = 6.25 bags
So for 1m3 of concrete work of m15 grade comcrete nearly 6.5 bags of cement if required..
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Is it necessary to apply tack coat over the primecoat. IF not what happens.answers other than 1.to superimpose the next layer(2) to adhere the layers so as to form homogenity.
I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.
by which materials we can prepare circular shuttering with tentative cost of material(rate analysis)
what is the Purpose of Adding 20% of wet mortar & 1/3rd to Dry Mortar for PCC & Plastering & Rcc .is there any standard method for adding this .?
what isload waring calculation
Why do you want to work here
how many minimum admixtures are used in water froofing structures
What is the tallest man made structure in the world?
what s the standrd size of pvc fittings ,like elbow, bend,tee etc ? please explain with figure ?
If we have the center line of the Finnish road level and we want to know what level of pay would have offset the Lhs and Rhus RHS 1,2.5,5 1,2.5,5 m.
Material calculation of cm 1:6 for 1sqm
I'm preparing to to build a simple house, but i don't know how to calculate how much cement, gravel and sand and hollow blocks i need to prepare. How many pcs of 4" or 6" hollow blocks I need for my planned 3mx6m house? thanks.
How can i do RCC rate analysis?
What Reinforcements Are Used In The Process Of Prestressing?
What is the standard volume of pharma in cub ft