Answer Posted / larry dorich
Soaking a transformer before putting a load on it is Definitely old school. Transformer Mfg.'s recommended energizing with voltage even at 50% of rated Voltage @ 50/60 Hz for 24 hours .The 60 Hz allowed the oil to saturate all the paper insulation in the windings. With out doing this the paper would burn @ full load which really would de rate the Transformer & contaminate the oil.
Is This Answer Correct ? | 0 Yes | 3 No |
Post New Answer View All Answers
How is the connection of the tap changer on the HV side been made?
Differentiate between kirchhoff’s first law and kirchhoff’s second law?
What is online and offline ups? how does it works?
How servo stabilizer works.
what will be the maximum winding temperature of 6.6kv HT motor 450kw, Full load current 49A. 50Hz Frequency.
What is the power factor of a transformer at no load?
how the speed of the gets motor regulated. does it draw the same current on the all speed level.
what are the available sizes of pin type terminal lugs in the market today?
What is super thermal power plant? and how it will differ from normal thermal power plant
What is the Designing & Selection Procedure for a DG/Transormer of rated capacity?
Write down the brushes of a de machine.
why the earth is taken minimum in supplying? wather it the proportional factor to getting work any equipment or a power plant?
What was the Dg set radiator and lube oil temperatures trip in ACB
WHAT IS MEANT BY OVER EXCITATION IN GENERATOR TRANSFORMERS? DESCRIBE IT.
Define the term Capacitance and Inductance?