What are the technical reasons for soaking transformers for
various times before allowing them to pick load after a
fault ?

Answer Posted / larry dorich

Soaking a transformer before putting a load on it is Definitely old school. Transformer Mfg.'s recommended energizing with voltage even at 50% of rated Voltage @ 50/60 Hz for 24 hours .The 60 Hz allowed the oil to saturate all the paper insulation in the windings. With out doing this the paper would burn @ full load which really would de rate the Transformer & contaminate the oil.

Is This Answer Correct ?    0 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How is the connection of the tap changer on the HV side been made?

1520


Differentiate between kirchhoff’s first law and kirchhoff’s second law?

615


What is online and offline ups? how does it works?

1625


How servo stabilizer works.

1643


what will be the maximum winding temperature of 6.6kv HT motor 450kw, Full load current 49A. 50Hz Frequency.

2764






What is the power factor of a transformer at no load?

668


how the speed of the gets motor regulated. does it draw the same current on the all speed level.

1465


what are the available sizes of pin type terminal lugs in the market today?

1424


What is super thermal power plant? and how it will differ from normal thermal power plant

1844


What is the Designing & Selection Procedure for a DG/Transormer of rated capacity?

1711


Write down the brushes of a de machine.

1429


why the earth is taken minimum in supplying? wather it the proportional factor to getting work any equipment or a power plant?

1464


What was the Dg set radiator and lube oil temperatures trip in ACB

1353


WHAT IS MEANT BY OVER EXCITATION IN GENERATOR TRANSFORMERS? DESCRIBE IT.

2176


Define the term Capacitance and Inductance?

662