for construction of 1 cum of brickwork what is requirement of cement, sand and bricks
Answer Posted / ravi
bricks 500
volume of mortar =0.2035 m3
dry volume of mortar =1.33*.2035=.306 m3
cement =.306*1/7=.0403 m3
sand=.306*6/7=.362 m3
Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
What are the techniques to measure road difference?
how to calclate the SHUTTERING TAKEN CONCRETE LOAD? WHAT IS THE LOAD BEARING CAPACITY IN STEEL SHUTTERING PLATE? WHAT IS THE CONCRETE LOAD IN (MASS) IN THE SHUTTERING PLATE. PLATE SIZE IS 120CM* 90CM CONCRETE WALL LENGTH IS 10M ,WIDE IS 60CM, HEIGHT IS 1.2M PLS TO SENT THE CALCULATION.
how to preaper for interview wat they asked in interview give me idea
What are the strongest shapes in building?
What is the tallest man made structure in the world?
Define block?
What is the diameter of the 3"inch nails?
How to Know that veriation acceptable in CPWD Work Of 1:6 Cement Mortor Received Lab test report.
what is the maximum number of course that can be laid according to IS code and the max height.
How should we design a brick column and footing?(note: no reiforcement to be provided) Can you tell me any reference book where i could possibly find this design? Plz help urgently
Why was the empire state building made of steel?
What is fineness modulus ? and its sieve # ?
A sieve analysis results in 100% retained in no. 50 Sieve, the fm is?
how to caluclate sienerge qty in construction in ap
How much percentage of brick bats allowed in CD-75 bricks