I have 1500KVA transformer ,How much Maximum KW Load is
allowed?

Answer Posted / jc millar

When does the other KVA ratings come into play. For example consider
OA 55 C / OA 65C / FA 55 / FA 65 C.
Assuming the maximum demand process load is used to select the base rated KVA
i.e. OA 55C.
When do the other KVA ratings come into the load study ?
We understand the max. group motor load starting being = < 65 % Base KVA.
Can someone please explain.

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Can Anyone Answer anyone of these ? Q1) why direct SOLUTION of Load Flow Studies in Not Possile ? Q2)Why majority of Buses in power system are load buses Q3)Why one of the buses in Power system is taken as reference bus (slack or swing) Bus ? Q4)Bus Admittance Matrix is a sparce (means it contains some zero elements ) matrix , give reason

1464


how generator avr give to the input?

1602


What is the reason for using a GE G101 MCB in place of an EP102 MCB if both are capable of AC circuit protection?

2286


Can anybody please refer the best and simple book for about Protection relays and in detail of all its protection ?

1588


What is CVT and what is relation with wave trap?

1771






what is ratio of copper wire size and current ?

1461


What is installed in PAC that is control the humidity

1160


How to know Resistance and Reactance value of main and aux winding of single phase capacitor start capacitor run induction motor to find capacitor value?

1610


Name the types of motors used in vacuum cleaners, phonographic appliances, vending machines,refrigerators, rolling mills, lathes, power factor improvement and cranes.

789


who invented active elements? plz give me the complte details of active elements...

1515


I am EEE student i want to improve my core side skills.how cn i approach it?

2091


how we can calculate 2 phase welding transformer rating or total power?

1496


What can you contribute to the progress of our Company as an employee if you are selected?

4992


l&t switch FN 63 handle position can we change

2193


i want use the cable size 16cx4 core aluminium usege watts 240x2000w this cable size is correct?

1877