Can we use 16mm dia bar in place of 12mm dia bar in COLUMNS? (if given dia bar is not available on site)
Answer Posted / mairaj khan
Yes You can use to increase strength of column but in my view 12mm bar is sufficient, if column size is under 12×12 inch. So you should not waste money and an engineer says constructions should be economical.
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
The largest size of paper used in plotter to print the drawing made by Autocad .
if i have to draw bending moment diagram of 4 way continous span then how to create it and how to find reaction?
the water is flowing through a velocity of 1.5m/s in a pipe of length 2500m and dia 500mm. at the end of pipe a valve is provided. find rise in pressure 1. if the valve is closed in 5 seconds. 2. if the valve is closed instantaneously. take value of c = 1460m/s, pipe to be rigid and bulk modulus of water - 19.692x10' n/sqcm
What are the alternate material for steel, Sand and aggregate
Is there any course for billing available in Mumbai? If yes then please mail me the details..
in a corner footing of a building, column lies in one corner. in this condition i want to know if the reactive pressure of soil will be uniformly distributed throughout the footing or will be uniformly varying as in the case of eccentrical loading.
we have a bore well 275 depth & water is deliver at distance of 1000 feet from the borewell here iam not include the distance of depth and the deliver water horizontally at our reserviour tank on ground level
why the profile of shell of natural draught cooling tower is hyperabolic.
How to activate isometric axes in cad?
How to calculate Volume of Wet cement concrete for a specific grade?
Can we apply curing compound on ceiling (slab Bottom)
how to create our resume?
You have 3 snd sample of different FM=0.21,FM=0.95,FM=2.90 which one is suitable for a)plastering on R.C.C b)plastering on masonary wall c)concreting column d)concreting of bored pile.also justify your answer.
PL.tell me about civil engineering questions with answer
Q 1) 1 Mason and 2 LABOUR / _________CUM brick work Q 2) 1 Mason and 1 LABOUR / _________SQ FT Plaster work Q 3) 1 Carpenter & 2 Labour/_________SQ FT shuttering work Q 4) 100 SQ FT roof slab concreting ____________mason and labour required