Answer Posted / v.mahesh

m5 = 1:4:8
m10= 1:3:6
m15= 1:2:4
m20= 1:1.5:3
m25= 1:1:2

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Soil bearing capacity formula

1227


Special thing in designing a overhead reservoir ? which is different from an ordinary design

763


what is civil enginnering & what you need of this course?

1799


What is the standard rate of installing ties for column(60cmx60cm) and beams(50x850)(weight)

1197


what is diffrence between catchment area,watershed and basin?

2500






how much concrete solid/hollow block are manufacture per 50 kg cement bag in differnent sizes like 400x200x200mm, 400x200x150mm, 400x200x100mm. And need proper ratio as per sale quantity. pls send my mail mathi7599@gmail.com searching last two years not yet get pls find and enclosed pls. need practical analysis.

2245


contractor receive 100 MT steel.after compliting the work the contractor refund 90 MT steel.How reconsilation of steel done?

1899


Why are separation membranes used between concrete pavement slab and sub-base?

827


In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.

1816


IS THERE ANY JOBS FOR THOSE WHO ARE IN FINAL YAER OF ENGINEERING(CIVIL) IN MUMBAI

1594


Why do you want to work here

1849


suppose that  156000 sq.ft rcc work builtup are.how many % of brick work to rcc work.

2309


what is the difference between natural draught cooling tower and induced draught cooling tower

1831


which red: used in roof teping, then use only cement

1567


why demand factor less then 1 ?

1775