Answer Posted / khursheed
PCC is done
1-To provide a plain surface as foundation bed
2- To provide a barrier between the soil & concrete
3-To provide to distribute the foundation load uniformly to soil up to some extent.
| Is This Answer Correct ? | 4 Yes | 0 No |
Post New Answer View All Answers
what is meaning of inverted beam.is it way to provide double mat in slab one at bottom and another at topif we go for provision of inverted beam. shall we construct structure with out plinth beam for us we have to construct small bus shelter
For what purpose bedding is used under storm water drains?
Which purpose we use deck anchor in bridges?
What is Critical path in Ms-Project ?
Can compresive strength test for concrete at 1 day age possible to carry out? If yes, which IS code describes the procedure for such testing?
Gave a cantilever beam with 3 legs.Told to draw the bending moment diagrams, axial force diagrams and shear force diagrams.From BMD he asked to show how the reinforcement will be provided on the tension side.
residential buildings,mixing of concrete,structural,construction material,site handling.
Pls provide me with the calculation or codes related to de- shuttering of flat slabs
What is the maximum crushing load in Kg & crushing strength in N/mm2 for M25 & M 15 Grade concrete
Design a rectangular channel.
how to calculate freeboard in under ground water tank and technical details
can stub column take the load as main column
CAST EFFECTIVE WATER SUMP CONSTRUCTION DETAIL
what is cross hair cursor?
60-70 grade of Bitumen is VG-30 ?