Answer Posted / dronachari
50d, compressive zone 24d,Tensile zone 40d
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
How to calculate brick work quantity?? Block work quantity??
02. a. The diagonal of a 9 cube…………… 1 b. Surface area of 9 cube…………… 1 c. Volume of 1-3 cube …………… 1 d. Compressive area of 6 cube …………… 1 e. Top & Bottom face of a Cylinder/Cube is to be proper leveled to deliver the…………………………..…… properly.
What are the main reasons for conducting pull-out tests for soil nails?
What will you do if a portion of load bearing wall collapses under your supervision?
Doul Bar reinforcement and details of drawing.
how to diffenentiate the fixed beam and simply supported beam in the execution while reading the drawing and how the reinforcement detail will be differ for the above.
please send me bhel questions on rupesh.017@rediffmail.com
What are the phases inspections are done by local authority while construction?
What is c.g.i sheet which used for roof??
How can you achieve soil enforcement?
Explain the Strength of brick?
How much quantity of rod binding work by a rod binder per day
Iwant to calculate the production of 1 labour for concrete casting which includes shuttering,scaffolding,steel fixing,concreting, deshuttering and curing in 8hours.But i am not able to determine it approximately would you pls.??
The foundations are placed below ground level, to increase?
Explain what are the skills required to become an architect?