How we can calc. the Backup time of a battery Bank???
Answer Posted / mahesh meshram
Calculate the AH of battery as said above or the given by the manufacturer if is same then ok if not then take actual calculated. If capacity of battery is 10AH and load current is of 10A then it will give back up for 1H
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
If we are given a 10 amp cable type and asked to calculate the number of cores used and the thickness of the cable, how do we do it?? please help...urgent!! i hope the question is clear enough!!
what is diff btw electric,magnetic & eletromagnetic field
how synchronous condenser is used in place of synchronous generator with out negotiating IEEE standards? Can i use 3 generators as synchronous generators and 2 generators as a synchronous condensers in an IEEE 14 bus system with out disturbing the standards?
what is the step by step formula for calculating bus bar phase and neutral size of a panel board.suppose the incomer of panel board is 100A..???step by step answer please
Define ohm’s law for a.c (alternating current)?
What is the mechanism of WTI
hi frenz,its aswathy.i hve aplied for the hpcl test on feb,pls send the test patern & the placement papers as soon as possible. mail-id :kjaswathy@gmail.com
PLZ EXPLAIN THE INTERLOCKING AND CONTROLLING OF CONTACTORS????HOW CAN I DO THAT?
I am inpecting a 10kVA UPS what tests should i do and should i observe?
our industries ht line so power fluctation(once drop of power please rectify causes
Draw a 230kv two-bus bar system showing the following. 1.Two generators (150MW) each connected through one 15.75/230KV transformers 2. 1 outgoing lines 3. Two 230/130 KV transformers 4. BUS PT's 5. CT
How to check the cable fault / hv test of transformer cable.
Role of active and reactive Power sharing in between two synchronized Generators, Droop Setting role ?
Dg pf .71 i am improve pf 0.80 what capacitor connected in dg how?
We have received supplies of the ordered material. payments against the supplies also released. Where ST paid 4% against form C. Meanwhile it has been observed that 25% of material supplied was defective. Please suggest whether the issuance of C form from our side would be stopped till settlement of liabilities.