How to calculate the quantity of brick or mortar in m3.
like in 1m3 brick =....no.
.......mortar=....m3
Answer Posted / sudar
The size of the modular brick is 190 X 90 X 90
Mortar Thickness is 10mm
Assume required brickwork volume is 1 cubic metre (m3)
Volume of bricks with mortar
Volume of 1 brick with mortar = 200 X 100 X 100 ( 10 mm mortar thickness on all sides)
= 0.2 X 0.1 X 0.1
Volume of brick with mortar = 0.002 Cum (m3)
Therefore, Number of bricks required for 1 cubic metre = 1/0.002 = 500 No.s
Volume of bricks without mortar
Volume of 1 brick without mortar = 190 X 90 X 90
= 0.19 X 0.09 X 0.09
Volume of 1 brick without mortar = 0.001539 Cum (m3)
Volume of 500 bricks without mortar = 500 X 0.001539 Cum
Volume of bricks without mortar for 1 cum = 0.7695 Cum (m3)
Therefore,
Required amount of cement mortar = 1 Cum – Volume of bricks without mortar
= 1 – 0.7695
Required amount of cement mortar = 0.2305 Cum (m3) (Wet Condition)
Dry volume of a mortar = 0.2305 cum X 1.33 = 0.306565 cum
We Assume the mortar ratio is 1:6 (1 part Cement & 6 Part Sand = 7 Part)
Required amount Cement quantity in brickwork = 0.306565 X 1/7 X 1440 kg
Required amount Cement quantity = 63 Kg = 1.26 bags (50 Kg bag)
Required amount of Sand = 0.306565 X 6/7 = 0.26277 Cubic metre (m3)
Therefore, For 1 cum of brickwork, we need
500 Numbers of bricks
63 kg of cement
0.263 m3 of sand.
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
punj loyed and sapurjl palanjl
Who built the sears tower?
why demand factor less then 1 ?
I need old MMUP exam question and answer for Civil engineering
What is the sugested procedure of water purification for public supply?
give me the mix proportion for design mix concrete M 7.5 grade 1:4:8
How do you calculate the power of centrifugal pump?
What is the compressive strength of fly ash bricks?
Why are the bolts that hold steel rails together in oval holes?
What is absolute pressure? How absolute pressure is calculated?
how to calculate Rate of analysis for 100 m3 Any ratio of concrete ? including labour
why we provide bent up reinforcement bars at l/4 ? if it is because of diagonal shear , how does it acts ?
how to take concrete quantity for precast segment for viaduct project?
How to measure the requirement of cement n sand for 12mm and 20mm plastering thanks in advance
what values & beliefs have guided you in your career path