How to calculate 45 degrees bend Steel bar length in Slab
Reinforce ment

Answer Posted / shamshad

Cutting Length of Bent Up Bars

So you have given reinforcement detailing of a slab.

Now you have to give instructions to the bar benders about cutting length of the steel bar according to the slab dimensions.

If it is a small construction, you can hand over the detailing to the bar benders they will take care of cutting length. However, that must not be perfect. They actually don’t give importance to the bends and cranks.

They may give some extra inches to the bars for the bends. But it’s not the correct way.

Let’s do it in a right way…

We are not going to explain the whole reinforcement detailing. [BBS Shape Codes]

We are taking the below example of single reinforcement – bent up bar to explain

Given

Beam Cross Section

Diameter of the Bar = 12 mm

Clear Cover = 25 mm

Clear Span (i.e “L”) = 6000 (Length of the slab)

Slab Thickness = 150 mm

Ld = 40d (Development Length). We know the difference between lap length and development length.

Calculation
Therefore,

Bent up Bar cross section

Cutting Length = Clear Span of Slab + (2 X Developement Length) +(2 x inclined length) – (45° bend x 4) – (90° bend x 2)

Cutting Length = Clear Span of Slab + (2 X Ld) +(2 x 0.42D) – (1d x 4) – (2d x 2) [BBS Shape Codes]

In the above formula, we have all the value, (except D)

Ld – Development Length which is equal to 40d

d – Diameter of Bar

So D = height of the bend bar (refer the image)

“D” = Slab Thickness – (2 x clear cover) – (diameter of bar)

= 150 – (2 x 25) – 12 = 88 mm

“D” = 88 mm

Now we know the “D” value which is the clear height of the bar (refer the image).

In order to find the inclined bar length using (Trignometry Function)

Inclined length = d/(sin 45°) – d / (tan 45°) = (d/0.7071) – (d/1)= (1d – 0.7071d)/0.7071= 0.42 D

we are providing four 45°bends at inner side (1,2,3 & 4) and two 90° bends ( a,b ).

45° = 1d ; 90° = 2d

Coming back to the formula,

Cutting Length = Clear Span of Slab + (2 X Ld) +(2 x 0.42D) – (1d x 4) – (2d x 2)

= 6000 mm + ( 2 x 40 x 12) + (2 x 0.42 x 88) – (1x12x4) – (2x12x2)

Cutting Length = 6938 mm or 6.94 m

So far the above dimensions, you need to cut the main bars in 6.94 m length.

Hope this helps. Happy Learning 🙂

Is This Answer Correct ?    7 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how to tie 10 legged stirrups

5899


What is the difference between engineering stress and true stress?

655


manhole chamber having height of 2300 mm and thickness of brickwork is 230 mm and dia of opening covering is 560 mm and bottom length vertical is 1500 mm (1:4) brick masonry and plaster 12 mm on both sides..how to estimate the no bricks used with mortar cement bags and sand for total chamber including plaster.

1367


How to Calculate Materials Required for PCC 1:4:8 for 1Cum & Brickwork 1:4 for 1Cum & Plastering 1:4 (15mm Thick) for 100Sqm & RCC 1:4:8 & 2mt ( L1=1mt & L2=1mt ) length of 12mm Steel bended in 90degrees what is the formula to calculate Weight & Actual Length ?

10652


Why are steel plates inserted inside bearings in elastomeric bearing?

837






what are the values of compressieve strenght?

1600


what is the minimum cement content for M20 & M25 as per is code -456(2000).

2710


why +1 to be followed for calculating the no of bars in BBS. Please explain

1516


Advantage of Aluminum form work in terms of activities can be skip and cost too

569


With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr

1950


how to identify the failure of building by expansive soils

1233


what is the productivity in aluminium shuttering per day

1583


What does a construction cost covers and what does not?

739


Define What are the materials used in building a gravity dam?

737


What is chemical composion test

1511