Answer Posted / ishfaq majeed
Your Answer4*10*10cm
Is This Answer Correct ? | 1 Yes | 2 No |
Post New Answer View All Answers
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
how to calculate the mortar for 10'*10' size room for both plastering and for masonry work?
where i can get material costs on weekly basis
Required concret Surface Temperature prior to coating of epoxy pain with references ASTM or ACI whatever
how we check the thickness and line of ceiling plaster.
What in bending moment, if a moment is free end of cantilever beam?
For sloping slabs or sloping beams why the tension steel from either side of ridge is taken into compression zone of other side?
Which code specifies the specification ofthe construction joints to be provided in the raft slab of a basement which is 6 m deep.what should bethe detail of such a joint?
The mixture of different ingredients of cement is burnt at?
57. Calculate the volume of a truck loaded with stone chips whose data are as follows– 5 Top Length - 13-9, 13-10, 13-09 Bottom Length - 13-11, 13-10.5, 13-10 Top width - 8-7.5, 8-8, 8-7 Bottom width - 8-7, 8-8, 8-7.5 Depth - 2-0, 1-11.5, 1-10, 1-11, 1 -10.5, 1-11.75, 1-11
what are the types of design? which type of method is used at what type of design & why?
Bitumen grades are 30-40,60-70, 80-100. what is mean by 30- 40
rimmer in pile foundation
Tell me about triple point of water.
If specific gravity of cement is less than 3.15 what is the cause?