Till how many days can we keep a cement bag without using? And on what conditions the cement will get spoiled?
Answer Posted / aabid
Cement 3 month after 25 %
6 month 50%
So use for before 3 month
.
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
Define What is aggregate?
which software is better for design and analysis of buildings (stadd pro ) or (Etabs)
five requirements of infill panels for walls?
How to decide/consider the grade of bitumen for dbm.
how many men days of loburs and masons are requirete for 1 cum,pcc (1:2:4),Pcc(1:3:6) and Pcc(1:4:8) thanking you
how to control PQI (Project Quality Index)
what is the difference between natural draught cooling tower and induced draught cooling tower
I have an plot with area 35*47 = 182.77 sq yards. Out of this iam planning to construct house with 1350 sqfeet each floor .iwanted to build a G+2 house.Need cost estimation for each item
pls tell estimate for 1 kilometre length random rubble masonry 0.90 metre height 0.600 metre width
How many axes do cartesian coordinate system has?
Why is the use of granular sub-base in concrete carriageways not preferred, explain?
what isload waring calculation
Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.
Why should pumping be not used in case of concreting work?
Need help in designing a degasser tower for 2m3/hr DM plant, also send me the formulae used