Answer Posted / shekhar kundena
1370 degree centigrade
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Define the various stages of the project planning process in construction.
What happens when,in Prestressed girder the HDPE duct and cone size is provided more than required? (technical answer expected)
suppose we have a tendency to make a hole on the surface of the simple supported beam, than where we goes to make it?
what is tension & compression of steel bending.
Providing ,Cutting, bending and positioning of TMT Bar with cost of binding wire
Which Types Of Bricks ?
In which code the the maximum height of concrete casting has been explained
give me the rate analysis for Bituminous Macadam and SDBC
five requirements of infill panels for walls?
IS code for grade of concrete for bamboo lintel????
Find out Cutting Length of Steel for Right angle Triangle? Where Opposite Side 4m, Adjacent side 6m. (Assume cover 40mm)
i have four storeyed rcc building.basement of the building is around 34 years old.it does not have pillar support.it is having lintel steel support at every 7 feet of construction. how long this building will lost long . can any body help me in this regard
How to calculate or what is the process of calculation for making 1Metre squre area by AAC Blok which quantity of Cement, Sand & Chips are to be required?
The portion of a brick cut across the width is called?
What are your goals?