Answer Posted / nijagunayya hiremath
Dry lean concrete is the base for rigid pavements and is mixture of large ratio of 20 mm dn. Aggregate to cement usevally 14:1and cube strength shall be 5 N/ sq mm.
It has to be laid with paving equipment. It should be covered before putting above pavement layers by thin polythene sheet.
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
In Rcc ratio calculation I wanted to know quantity of Steel also.
Who built the sears tower?
How to calculate the cement and fine aggregate requirement for solid block masonry works in terms of Sqm. 1. 400x200x200mm 2. 400x200x100mm 3. 600x200x100mm 4. 600x200x200mm I need the answer for 1 Sqm of solid block works.
What do you meant by gui?
how to calculate the density for high density concrete ? or is it same as the density of RC?
Define What is the tensile strength of wood?
What is the procedure of concealed plumbing in toilets?
How to calculate concrete in percentage wise ,for example cement 18% sand 40% aggregate 40% and Stell 2% ,I need and??
what are the proper pipes for salt water line
What is .Dwg?
what is the clear cover for shearwall?
How are freeway bridges built?
trapozidal
what is conventional shuttering rate per square feet of built up area? what is Mivan shuttering rate per square feet of built up area? what is coupler shuttering rate per square feet of built up area?
kindly mail me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates plz send my email id- VMANDAL91@gmail.com