Draw block diagram BOILER COMBUSTION loop & Explain
Answer Posted / aditya199307@gmail.com
ETP (Effluent Treatment Plant) Actually the use of this plant is to remove impurities from the waste water which was used by the plant , we never drain the impurity contaminated water before the purification.
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is ultrasonic flowmeter?
why we are using magnet for calibration of gas detector?
Lux meter is the measuring device to measure the lux level of lighting fixture. in industrial sector two types of lighting fixture is being used as street lighting purpose 1. HPSV (Sodium) and 2. HPMV (Mercury). HPMV having white light which is an combination of red, blue and yellow colour, while HPSV haivng Yellow lighting. in HPSV red & blue colour will be absent. during measurement of the lux level of HPSV and HPMV fixture. 1. Lux meter can measure the actual lux level of both fixture? 2. or it will show false reading for HPSV fixture light as it has only yellow light present. please give me answer
what should he know if he is an assitent engineer instrumentation in cement industries of experience of 10 - 15 year.
what is your eligibility criteria for freashers?
I want measure the volumetric flow of gas in waste heat recovery Boiler?Tell me how and which type of instruments required. Plz mail me:naba02222@gmail.com Sam please post the answer .
I need control valve ISA hand book. Is there any site to download that big book containing all the pages. Written by Paul Friedmann
Coal mill Instruments Equipments for cement plant And process diagram ?
What are different type of instrument cable
What is 3 element control system
I am using 971 Enraf radar level transmitter for LPG tanks ,the tank side indicator gives the error code 999999999FL can any body give me any diagnostic for this issue?
How can i copy program (parameter) from mm440 (V.F.D.) by using BOP?
How to calibration a control valve?
Hi i m B.E. In elect. & comm. I m workin in bio mass plant from 6 mnths as inst. Engg. but now i m in dept. Of operation as shift engg...which is best operation or inst. 4 me? M confusd..plz help and reply me..
How does your previous experience relate to the job you are applying for ?