what is the maximum number of course that can be laid
according to IS code and the max height.
Answer Posted / n.murugan
Ten courses of Brick work (3'-0")
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
detailed calculation of the amount of cement used?
What are some structures that may be subjected to fatigue?
how i convert mm into standard wire guage (SWG)no.
What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.
for 16mm thick cement plastring 1:6 on 100 Sq.m.New brick work,the quantity of cement required is.
in the earthquqke the profile of water on dam is parabolic or not
how to calculate Rate of analysis for 100 m3 Any ratio of concrete ? including labour
what is the difference between prime coat and tack coat in road construction
Consumption of Binding wire for fixing of cover block in vertical surface
I have an plot with area 35*47 = 182.77 sq yards. Out of this iam planning to construct house with 1350 sqfeet each floor .iwanted to build a G+2 house.Need cost estimation for each item
what is mc arther pile?
which software is better for design and analysis of buildings (stadd pro ) or (Etabs)
While doing civil foundation of machinery. How will you process for it? & We also fixing plates at top surface of foundation, then what is the procedure?
Forces in a Shear Wall are in plane or out of plane ?
show answer/ calculate-1-2-4 ratio-concrete -cement-sand- metal-water - please brief calculation