For Beam steel reinforcement detailing, in the End of the beam do the making of L shape in the rebar is essential in all the cases, specially in the ends of the Beam?
Answer Posted / syed ishaque
At end support beam reactions are fixed beams.. maximum negative moments at support to balance these moments need to provide L and also some time provide extra bars. As per size and length of beams..
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
indian standard split spoon sampler
What is the difference between engineering stress and true stress?
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
How to calculate(Thumb rule) the consumption of steel per cubic meter for different concrete members.
the water is flowing through a velocity of 1.5m/s in a pipe of length 2500m and dia 500mm. at the end of pipe a valve is provided. find rise in pressure 1. if the valve is closed in 5 seconds. 2. if the valve is closed instantaneously. take value of c = 1460m/s, pipe to be rigid and bulk modulus of water - 19.692x10' n/sqcm
sir, please send me the web address of chennai railway to know the online examresults of junior engineer[civil].
how gradation of aggregates effect on slump of fresh concrete?
Please tell me the quantity of cement, sand, flyash, foaming agent required for 1 cubic meter of cellular lightweight concrete blocks. also , is there any admixtures required for the CLC blocks production.
What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.
Can we use concrete of slump cone in cube casting in which we have already measured slump?
What is the frequency of sampling for the materials of cement,Fine aggregate, Coarse aggregate .and refer which code
which red: used in roof teping, then use only cement
How Can I know the wastages(%) of each work added in estimating the quantity of construction materials?(Eg. Ceiling Work, Brick Work,etc....)
What tor stands for in tor steel?
Name the main components of a cad gui?