Answer Posted / koushik mondal
Bar bending schedule is a type of estimate which calculate the value/quantity of all reinforcement of a project.
Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
IN Compression testing machine 1division =10KN ,then what is compressive strength of 100*100 mm cubes at a load of 320 KN
what are the strength theories for yeilding and fracture materials. state the theory more suited for 1. mild steel or 2. concrete
what is total volume of ingredients used in concrete accordingly
is concealed wiring a problem in fly ash brick wall?
why is M25 and Fe 500 assumed to be most economical? i feel it is not.This is because higher grade of concrete and steel has higher lapping length and anchorage length compared to lower grades..
Method of findingthe dry ingredient quantity of 1 m3 concrete. what is the difference between static and dynamic induced emf? Testing charges bill given for Rs. 32,000/- but not added service tax in this bill. So, How much TDS will be deduct
How much percentage of brick bats allowed in CD-75 bricks
why we use aggregate,sand with cement in concrete?
What is diversion tunnel in a dam?
PLS.......... ANY ONE CAN FORWARD ME PREVIOUS QUESTION PAPER hpcl civil engg
Minimum concrete cover in slabs, columns, beams, foundation and other st?
What is the use of mirror command?
Caching, Multithreading and RAMBUS are 3 methods for resolving the Bottleneck problem. Please give an explanation for each one (how are they resolve the problem?)
how to calculate the steel in 500yard
How long does it take concrete to harden?