Why attemperation is required in HRSG in a combined cycle
power plant?

Answer Posted / sunil

In CCPP secondary superheater coils are located near to flue gases and exhaust of gas turbine enters boiler . Exhaust of GT are at high temp around 600C

Is This Answer Correct ?    0 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

By any way can we increase the B check hours from 300 to 500

1699


what is the trip circuit supervision in an electrical meaning?

1447


can dp type level transmitter work in under vaccum condition

1543


LAPT working in alternator / generator

2551


DCS marshaling Cabinet Power supply can be replace during plant running time? Answer Yes it is possible. I am talking about the controller and cards power supply modules. They are always redundant and connected through diode so that if one power supply fails the other can take the charge immediately.so it is possible to replace one of them in running plant if the other one is healthy. MY question is how switching done.

517






procedure of how to generate power in solar plant.

1379


dear sir i have completed one year post diploma certificate in thermal power engineering from national power training institute durgapur ...plz suggest me for power sector job

2072


How do you consider that you can improve and what assistance do you need to achieve this

1336


Why superheated are started before I'd and rd fan?

1695


what is the meaning of SST300 V56A in SIEMENS turbine

3888


what's the moog valve

1057


How to calculate power press toneage

1559


what is the basic use of power plant in equipment

1231


What is difference between secondary Air & Tertiary Air and Their use.?

1480


How We Calibrate the vaccum transmitter?

1471