Please tell me 1 Sqm Steel 14mm center to center .200,.200
Post New Answer View All Answers
is there any thumb rule for calculating construction cost of the building with pile foundation per sft. area?
What are the disadvantages while using stone dust as filler in pavements?
What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.
How to calculate chejja reinforcement
what is BPM in concrete demolition hammers. what is better a higher value or lower
02. a. The diagonal of a 9 cube…………… 1 b. Surface area of 9 cube…………… 1 c. Volume of 1-3 cube …………… 1 d. Compressive area of 6 cube …………… 1 e. Top & Bottom face of a Cylinder/Cube is to be proper leveled to deliver the…………………………..…… properly.
I need to constructive work in amaraj batteries
Please let me know about answer for my Question as "What is the maximum wastage allowable of HYSD Steel in any Bridge project as per Code and Code reference also ?
I HAVE APPLIED FOR 20TH UES ARMY. I WANTED TO KNOW WHEN WILL I RECEIVE CALL LETTER FOR THE SAME.
a) we have 30nos., 300mm dia, 4m length double under reamed piles.calculate excavation quantity.b) tell concrete qty. also.
what is the function of GSB all class ?
How many cement sand ballast in cc 1:4:8 40mm
what is called the inverd level of mabhole chamber?
how much of quantity of material required for execution of one cubic meter of random rubble masonry in 1:3 cement mortar
What are the causes of building collapse?