1.what is the main responsibilites of Site Engineer ? and
what are main attitude ?
Answer Posted / kanchan
First responsibility of CE is to carry out work as per drawing and specification
1) Finding out the quantity of material
2) Wastage of material
3) Time period of work execution
Deshuttering & curing comes under this category
4) Quality control
5) Labour management
6) Supervising the work at every step
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
What is the procedure of concealed plumbing in toilets?
Design a cantilever slab to carry a live load of 2000 N/m2. The overhang of the slab is 1.20m. b) A slab over a room is 4.75m x 4.75m. The edges of the slab are simply supported and the corners are not held down. The live load an the slab is 300 Kg/m2. The slab has a bearing of 15cm. On the supporting walls. Design the slab as per Rankine - Grashoff theory. Assume weight of R.C.C. = 2400 Kg/m2.
Why was the empire state building made of steel?
how much to get of BRC lapping in full yield and half yield ?
what is the types of surveying?which type of survey carrying for type of work?
How high should the water tank be to provide a 60 psi at base of this water tower?
psc girder detail
Can we apply curing compound on ceiling (slab Bottom)
what is right & short method of measurement of slab&beam
how to calculate the dry wt of sand and cement for a required design mix?for ex:M20
Calculation of curtain wall of box culvert
percentage of metal,clay or soil & water in water bond macadam roads to know the quantities for each in total volume of 11500 cubic meters
Explain the design for rcc multi-storied building?
what is the 0 value in quantity surveying
WHAT IS THE % OF CONCRETE WASTAGES PERMITED IN A LARGE PROJECT ? AND WHICH IS CODE TO BE REFERED.