Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

1.what is the main responsibilites of Site Engineer ? and
what are main attitude ?

Answer Posted / kanchan

First responsibility of CE is to carry out work as per drawing and specification
1) Finding out the quantity of material
2) Wastage of material
3) Time period of work execution
Deshuttering & curing comes under this category
4) Quality control
5) Labour management
6) Supervising the work at every step

Is This Answer Correct ?    2 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the procedure of concealed plumbing in toilets?

2358


Design a cantilever slab to carry a live load of 2000 N/m2. The overhang of the slab is 1.20m. b) A slab over a room is 4.75m x 4.75m. The edges of the slab are simply supported and the corners are not held down. The live load an the slab is 300 Kg/m2. The slab has a bearing of 15cm. On the supporting walls. Design the slab as per Rankine - Grashoff theory. Assume weight of R.C.C. = 2400 Kg/m2.

2863


Why was the empire state building made of steel?

1149


how much to get of BRC lapping in full yield and half yield ?

2552


what is the types of surveying?which type of survey carrying for type of work?

2190


How high should the water tank be to provide a 60 psi at base of this water tower?

1144


psc girder detail

3183


Can we apply curing compound on ceiling (slab Bottom)

785


what is right & short method of measurement of slab&beam

2122


how to calculate the dry wt of sand and cement for a required design mix?for ex:M20

2570


Calculation of curtain wall of box culvert

6108


percentage of metal,clay or soil & water in water bond macadam roads to know the quantities for each in total volume of 11500 cubic meters

2147


Explain the design for rcc multi-storied building?

1154


what is the 0 value in quantity surveying

2409


WHAT IS THE % OF CONCRETE WASTAGES PERMITED IN A LARGE PROJECT ? AND WHICH IS CODE TO BE REFERED.

2036