Two types of piling

Answer Posted / nitesh singh

Under reamed pile are two type-
1-single underreamed pile and
2-doubled underreamed pile
The ratio b/w double underreamed to single underreamed pile is 1.5for sandy and clayey soil

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is directivity effect?

1719


Explain the various stages of the project planning process in construction?

706


what is meant by residual strain?

1800


How to calculate concret slab? W l t(4mts*5*2fts) ratio m25 grade pls tell me procedure

1773


02. a. The diagonal of a 9 cube…………… 1 b. Surface area of 9 cube…………… 1 c. Volume of 1-3 cube …………… 1 d. Compressive area of 6 cube …………… 1 e. Top & Bottom face of a Cylinder/Cube is to be proper leveled to deliver the…………………………..…… properly.

1680






roll of DLC in road constructions

1412


How to arrive dry volume of concrete (1.52 to 1.57) ?

1905


What is meant by cad?

650


Please tell me any one, how many quantity concrete paver block fixing perday ( 8hours) per mason??

1172


Why Vitrified tile are getting pop up.

533


HOW TO CLACULATE CEMENT AND SAND CONSUMPTION FOR THE STAIRCASE KOTA FLOORING IN THE RATIO OF 1:4 50 MM THICKNESS

4227


I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.

1563


As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.

1493


how can we construct building without foundation providing only grade beam at ground level

1070


how to check and keep control on the wastage of material at site

1860