Post New Answer View All Answers
What are some facts about concrete?
how much quantity of 1.5" nails and 2.5" nails are required for conventional formwork shuttering?
What is the snap size in civil and how can we create it?
Why do we not deduct steel volume to find actual volume of concrete in practical as we have studied that,,, actual volume of concrete = volume of column- volume of steel pls explain with reference of IS code?????
Define What is passive earth pressure ?
Which is the latest version of solidsworks?
what is the list of building construction equipment & teir output?
B.M DIAGRAMS & S.F DIAGRAMS OF CONTINOUS BEAMS
My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).
How is the leaning tower of pisa supported?
TO CONSTRUCT A 1800 SQFT CAPACITY UNDERGROUND WATER TANK HOW MUCH CUFT CONCRETE IS REQUIRED AND HOW MUCH REINFORCEMENT IS REQUIRED. FOR COSTING
What are the different theories of failure under static load?
how we calculate the grade of the Bituminous materials.?????
why should we use 20mm graded metal only in vrcc?why we shouldnot use 40mm metal?
What is the sugested procedure of water purification for public supply?