Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

types of motors suitable for escalators with reason

Answer Posted / ajay

Shunt motor

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Define liftable weight of a transformer? Does the total weight of transformer include oil weight?

2501


I FINISHED MY B.TECH IN EEE . I AM IN NEED OF A GOOD TRAINING INSTITUTE TO DO COURSES .. CAN ANYONE SUGGEST GOOD CENTRES IN TAMILNADU ,BANGALORE ,OTHER AREAS???????

2021


What aturn on methods of scr?

1196


In Air circuit breaker LSIG protection unit is used. Without fault in cables (2 runs 3Cx150Sq.mm Copper, 1Kv grade, XPLE armored cable IR value is more than 550Mohm @ 500V Megger) and load section Long time Overcurrent protection is triggers and trips the unit. We changed LSIG protection with new factory tested unit. Even then fault is persisting. Please suggest the possible causes

810


How grounding is different than earthings?

1172


Whether it is possible to measure energy at the input of rectifier transformer (12 pulse with very high odd harmonics)

1910


What is the effect of pi controller on the system performance?

1129


how we start 40w tube light with 4 diodes,2capacitors,1 choke and without starter.(a product avilable in market which lights burnt tube lights also)

2058


what is the saturation point of crgo lamination.

2242


How to configure the drives in PLC, through Profibus commnication. And to how to address it?

2847


explain PV modules in solar energy generation.

1937


HOW TO REDUCE POWER PLANT AUXILIARY POWER CONSUMPTION?

3421


distribution is maximum done by a)radial b)network c) parallel d)b & c

1954


hi , i have 150 kw loud and we need 50 m cabil,i want to know wich size cabil we use. thanks

2166


working principle of oil startar

1898