How can we design MEP services for Commercial Building in
area about 22 Acres of land?
Answer Posted / shiva
MEP design will be majorly three parts.
Electrical:
Load to be calculated after approval of the client. then the cables, panels, lights to fixed.
Plumbing
There are two types here. 1. Water supply system and 2 Drainage system.
ACs - if any
Fire protection system.
| Is This Answer Correct ? | 11 Yes | 0 No |
Post New Answer View All Answers
If o/p power is doubled by how much does the sound increase
The height to which the liquid in a tank to be maintained for a certain constant velocity?
how does high earth to neutral voltage affect electronic equipment?
How vfd saving power.
What are conduct on the testing in cf in ur site?
Which power will flow first if we switch on a motor Active or Reactive? How?
What is the comparison between 30mA DP RCCB and 100mA DP RCCB and can replace it against 63A MCB
Is it possible to use a S1 duty class motor for crane application (S4)? If not, why?
what is meant by 2 within a star in a voltmeter dial?
my name is venkat .i have good percentage in my academics(ssc 86, intermediate 83 b.tech 73) my question 1..after completion of my ssc i joined in bpc but i didnt got rank in emcet so i completed MPC in one year compartmentally ..so here what am expect question from this background?
There is air in a room . the top and bottom of the room are at constant temp. T1 and T2. DRAW THE temp profiles if a. T1 greater than T2 b. T1 less than T2
Is it good to short Neutral and Ground in the PLC or DCS main Power supply. Pls give YES or NO with reasons...? Simarpreet
Why in metering Ct for ammeters ct secondary side is grounded for each Ct but not in case of CBCT (Core balance current transformer)..kindly some1 highlights the reason..is it because net flux is zero?
How will calculate losses in an multi core Aluminium LT cable of different sizes & upto what length we can use a LT Cable ?
How to calculate capacitor bank value to maintain unity power factor with some suitable example?