how can we calculate cutting length of a column ring
(300 x 600)
Answer Posted / vadodara
300*600
300-80 = 220*2 = 440
600-80 = 520*2 = 1040
TOTAL
(1040+440)+(75+75) HOOK - 5(8)
=1590 mm
Is This Answer Correct ? | 0 Yes | 12 No |
Post New Answer View All Answers
what is the clear cover for shearwall?
How do you prepare Material Recovery Statement for deduction from contractors bills?
While doing civil foundation of machinery. How will you process for it? & We also fixing plates at top surface of foundation, then what is the procedure?
what are the five benefits of using standard terminology in the measurement process?
why we are using stub column..? is it possible to construct steel stub column..?
What is M40 _ TOR - EQ and B.F.S
why we provide bent up reinforcement bars at l/4 ? if it is because of diagonal shear , how does it acts ?
50 acre of land to be reclaimed for an average height of 2.5 mt. Dredging area is 500mx200m size. what is the dredging depth required to reclaim the area?
Who name us Engineer & Why?
What do you understand by “preset” during the installation process of bridge bearings?
what is w/c ratio in dry lean concrete for m10 mix design
in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh
how much of the strength comes from post-production curing
Differentiate orthographic and isometric projections?
hai, kindly send anyone for output workers format details for construction project in foundation to finishing.