What should be the size (Cubic meter) of a water tank for
1000 Ltrs. capacity?

Answer Posted / karachi khan

why you guys are not considering free board 150-200mm from slab?

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is the max. and mim. height of vertical post in informatry sign board which is used in highway projects.

2213


What is aggregate?

737


1. 1. The mass of a chunk of moist soil is 34 Kg and its volume is 0.012 cu. Meter. After drying in an oven, the mass reduces to 14.25 Kg. Determine the water content, the density of moist soil, the dry density, void ratio, porosity and degree of saturation. Take G = 3.25

2146


What is the standard unit weight of Cast Iron pipe of 200MM Dia.(pipe specification is IS1538)

3794


how much one carpenter can doing shuttering of slab in one day

2885






What is a kip?

723


Will water damage concrete?

772


Why reinforcement done in shorter span in two way slabs

1374


In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

1679


how many tonnes equals to one cubic feet?

1195


explain the rale of the government in the construction industry

1917


pile load testing procedure

1753


what is total volume of ingredients used in concrete accordingly

1810


what is conrete grade ,how are depent on concrete grad and size of concrete?

2054


for pretensioning which will yield first and same for post tensioning?

1718