Answer Posted / pankaj kumar goel
A temporary platform or system of platforms used for support; scaffolding.
2. The process or manner of putting on a play on the stage.
3. The act of jettisoning a stage of a multistage rocket.
4.
a. The operation of stagecoaches as an enterprise.
b. Travel by stagecoach.
Is This Answer Correct ? | 0 Yes | 3 No |
Post New Answer View All Answers
How much time Required for PPR pipe network testing
What are the responsibilities of a construction manager?
how to calculate Rate of analysis for 100 m3 Any ratio of concrete ? including labour
how to estimate costing from quantity givin in BOQ and according to this how we fill tender and final rate for perticular work.....?
How to compute minimum number of columns required for a site from area of site?
primary treatment of sewagw consist of removal of floating materials removal of sand & grit removal of organic materials all above
Stringer How many cm goes to landind
Explain the difference between shear and tensile strength.
what is the types of surveying?which type of survey carrying for type of work?
How to do base isolation using ETABS software?
List out some of the software program that can be useful for architect?
please what are the required bars for a beams of 6mx6m and 450x300mm, one is continuous and the the second is discontinuous ..Its a commercial building (church)
What are the delays in construction projects due to approvals from owners? How can we analyze them in different prospective? Whats their affects and effects on presently going work?
What type of tensile strength is handling by crank in beam? Thanks.