Why attemperation is required in HRSG in a combined cycle
power plant?

Answer Posted / murali

for control steam temp and to avoid secondary super heater coil metal temp high. becoz secondary coil location is near flue gas out from gas turbine. this gas temp around 620 degree Celsius

Is This Answer Correct ?    2 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Why superheated are started before I'd and rd fan?

1695


DCS marshaling Cabinet Power supply can be replace during plant running time? Answer Yes it is possible. I am talking about the controller and cards power supply modules. They are always redundant and connected through diode so that if one power supply fails the other can take the charge immediately.so it is possible to replace one of them in running plant if the other one is healthy. MY question is how switching done.

517


Which will have more strain energy 1.Spring 2.Circular disc 3.Solid square plate.

1883


procedure of how to generate power in solar plant.

1379


what does mean by kva rating

1000






By any way can we increase the B check hours from 300 to 500

1699


How to calculate boiler capacity? I have 1 Autoclave, Which has to use for AAC block. Dimension for this Autoclave is - 13 Meter Length & 2.2 Meter Diameter.

1826


How to calculate power press toneage

1559


how to differentiate between "ALL fuel lost" and "All Fuel Lost" in Boiler MFT condition?

1236


Looking for Bently Nevada surplus 3300/52-01-00-00 Reverse Rotation Monitor , 4 pieces.

2986


what is the meaning of SST300 V56A in SIEMENS turbine

3888


why is the in steam turbine axial displacement of active side thrust pad is positive and non active side thrust pad is negative.

2770


Qatar Fertiliser Company (QAFCO) Shortlisted me for interview (got the intel from my source) for Field Operator- Utilities post. Please let me know what kind of questions they asked? ... this position requires 5 years of experience in Power Plant and background Diploma in Electrical/ Mech. ... my Background is Electrical and I am a sub Assistant Engineer (Operation) at a private HFO based Power plant... PS: Please Let me know what preparation should I take to obtain the Interview which will be take place In Bangladesh soon

1771


our 125 kva DG does not start in AUTO mode works normally in MANUAL mode please give me a solution.....

1198


what is the difference between compensated & normal drum level in boiler drum?

1292