Answer Posted / farshmos

M10= 1:2:4
M15= 1:3:4
M20= 1:4:8
M25= 1:1.5:3
M30= 1:1:3

Is This Answer Correct ?    2 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the difference between one-way slab and two-way slab?

668


show answer/calculate mix 1:2:4 ratio -cement-sand -metal-water

1631


how lap length is increased with increase of Grade of steel?

25291


How do you prepare Material Recovery Statement for deduction from contractors bills?

1109


how to calculate quantity of cement,sand & aggregate for u.c.r / r.r masonry in cm 1:6

5799






Define Who designed the city of Washington DC?

639


psc girder detail

2718


In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

1679


Anyone have sample questions for bhel interview.please send me as Iam appearing for the interview on 19th sep2008. Kindly send this to my e-mail: arun_prasath_n@yahoo.co.in

1604


what is the Purpose of Adding 20% of wet mortar & 1/3rd to Dry Mortar for PCC & Plastering & Rcc .is there any standard method for adding this .?

1782


GIVE US YOUR FULL DETAIL OF THE FOLLOWING… FULL NAME.. PERMENENT MAILING ADDRESS DIRECT CONTACT NO E MAIL ADDRES.

2046


A Cat excavator loader of 3Lm*3 heaped capacity bucket is to be used to load blasted rock directly into a crusher of capacity (consumption) of 100L

1565


how much quantity of 1.5" nails and 2.5" nails are required for conventional formwork shuttering?

1224


What is the procedure of concealed plumbing in toilets?

1896


Need help in designing a degasser tower for 2m3/hr DM plant, also send me the formulae used

4283