Answer Posted / harish
1*1
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
what is the cost of rcc roof casting of 400 sq. ft. in kolkata
How to find permissible diagonal tensile stress in reinforced brick work
What is progress payment?
Ratio for 4500 psi concrete
what are the duties of Site Engineer in work site?
pls tell me about method of cutting length of ties column
I am doing a engineering contract with GOI. I have purchased certain material from outside Maharashtra and paid CST on that material @ 5.25%. Please intimate whether I will be liable for VAT or VAT on works contract or not.
what"s the sort of beams?
How much the quantity of Dry material of Crush for 1:2:4 Concrete, using pan 3/8'' down....
What is the outturn of Ceiling plastering
Sir, Iam Applied in rrb for the posts of Junior Engineer.I want to know about the or question previews to study well.Pl send it to shukla_varun1985@yahoo.com.
What ingredients with% found in ppc cement??
How you read 5x3x1 #4 @ 20" 0/C in steel structure?
As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.
I have an plot with area 35*47 = 182.77 sq yards. Out of this iam planning to construct house with 1350 sqfeet each floor .iwanted to build a G+2 house.Need cost estimation for each item