Answer Posted / surender
Area*.9/100 for slab
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
In which code the the maximum height of concrete casting has been explained
acceptance criteria for concrete works
1)Why we can use half brick in 4inch wall and 2)why not in 9+inch brick wall
Why nautical mile is different from statute mile?
I need old MMUP exam question and answer for Civil engineering
What goals do you have in your career?
can you mail me detailed procedure,entire syllabus and practice papers of mpsc civil engineering branch.I am in third year now
the water is flowing through a velocity of 1.5m/s in a pipe of length 2500m and dia 500mm. at the end of pipe a valve is provided. find rise in pressure 1. if the valve is closed in 5 seconds. 2. if the valve is closed instantaneously. take value of c = 1460m/s, pipe to be rigid and bulk modulus of water - 19.692x10' n/sqcm
what is the permanent solution applied for restoration of leaning tower of pisa?
What are the types of slump?
Reinforced concrete: suppose you are doing rough estimate for purchase of rebar for reinforced concrete slab for single stores residential building. You know total concrete volume will be 100 m3. How many tons rebar 6, 10 and 12mm will you require for the project?
for pretensioning which will yield first and same for post tensioning?
in 100 cft = 1350 bricks in 100 cft = ? bloks
Wat is meant by Aecron brick?
how calculate the bearing from two coordinates?