What is PQC. Means PQC
Answer Posted / mohammad yousuf pashtoon
P.Q.C is actually rigid pavement or plain cement concrete pavement which means there is no reinforcement in this type of pavement, but nominal reinforcement may use in it,
wearing surface of P.Q.C is plain cement concrete pavement,
materials for P.Q.C are:
cement
coarse aggregate
fine aggregate
| Is This Answer Correct ? | 6 Yes | 2 No |
Post New Answer View All Answers
the distrubution system in water supplies is designed on the basis of avg daily demand peak hourly demand coincident of draft greater of B & C
How its coming concrete grade M 20 means 1:2:4. how it coming 1:2:4.
a rectangle grill of length 72 inch x 20 inch width.how to calculate bar spacing ,bar consist 8 mm thickness and spacing of bar is 2 inch.. calculate no of bar with formula
yasser arfatcompleted his degree in civil from which university
1. For 10sq.m area(47 kg bitumen contain) of 45 mm thick bitumen mix layer..how much bitumen is required for 1600 sq.m and how much aggregate need for that ?? 2. And much tonnage of bitumen mix required for 10 sq.m area of 45 mm thick. Please give answer...
what is diversion?
what is Bearing Capacity,How to determine it?
by which materials we can prepare circular shuttering with tentative cost of material(rate analysis)
At what point does a circle start losing area when being flattened?
How to calculate sand , cement quantity for 23mm thk brick work(10x10)
2. In a container filled with each of the following materials, at a porosity of 40%, determine the upward gradient required to cause the quick condition (a) Lead shot with a G = 13.75; (b) Fibre beads with G = 2.15; (c) Sand with a G = 2.32
Bernaullis theorem deals with the law of conservation of mass momentum energy none
std penetration resistance in very stiff clays lies bet 2 & 4 4 & 8 8 & 15 15 & 30
i am completed my b.tech EEE in 2009,,,iam trying the job 3+ for AUTO CAD (ELECTRICAL),, what is the market for autocad electrical in hyderabad... how to handle the intervws give some suggestions ?
how to calculate labour strength for work for RCC,brickwork,blockwork,in &out plaster,flooring,dado,door frame & shutter,painting etc for constructing highrise building?