Answer Posted / naveen
5000 bricks
1 cumic = 500 bricks of standard brick size with motor 20*10*10 cm
so, 10cumic = 5000 bricks of sizw 20*10*10*cm
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
rimmer in pile foundation
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
Dear Sir, I work in hydro project. I want to hire Scorpio/ Bolero on monthly basis. But how can i justified its amount (Hourly basic). Please solve my problem
in 100 cft = 1350 bricks in 100 cft = ? bloks
Method of findingthe dry ingredient quantity of 1 m3 concrete. what is the difference between static and dynamic induced emf? Testing charges bill given for Rs. 32,000/- but not added service tax in this bill. So, How much TDS will be deduct
Process of pcc in wateredug
hoe much fine & sourse agregate required for concrete mix of 1: 1.5:3 by volume in Cu.Ft
how calculate the bearing from two coordinates?
1)What is the total volume of aggregates required for 1cu.mtr.solid hard concrete? 2)What is total mass of wet concrte and dry concrete after 28 days of M25? 3) Is 28 days strength is the final strength of concrete or it gets increasing as the time period increses.? 4)What is the volumetric proportion of concrete grade of M25.M30,M35,M40
What is the diameter of the 3"inch nails?
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
Time required for curing of wall tiles before fixing
What expenses counted in contingencies and how much it is in related to built-up area of the building.
Specific gravity of cement?
resins are not soluble in water soluble in spirit used in varnish left behind on evoporation of oil