Trapezoidal footing length = 2m , B=1.7m D=0.5m and d-
0.15m. Can anybody help and calculate quantity of concrete
by explaining all formulas involved.

Answer Posted / uday dudhrejiya

[L.b.d(small depth)] + h/3 {A1+A2+√(A1.A2)

Is This Answer Correct ?    1 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Please tell me the quantity of cement, sand, flyash, foaming agent required for 1 cubic meter of cellular lightweight concrete blocks. also , is there any admixtures required for the CLC blocks production.

1958


As in practice, we are deducting every 2d for 90 degree bend but from where it comes means derivation or reference of IS Code.

1432


what is the permanent solution applied for restoration of leaning tower of pisa?

3063


IS STEEL BARS IS AS PER ISI TRANSVERSE RIBS SHOULD BE UNIFORM IN DISTANCE, PLEASE EXPLAIN WHY,

1817


How to calculate brick work quantity?? Block work quantity??

2112






How to construct a water sump in a rocky soil?

1699


Define What are the uses of alloys in daily life and how are alloys made?

734


construction workers how much time take one work or qty

1133


In the design of bridge arguments what considerations should be made to select the orientation of the wing walls?

638


how to calculate 1:5:8 ratio concrete cement, sand, metal and water please give me brief calculation

1219


How do you compute the volume of airflow?

684


sir i want to know that in L & T construction can we do our 6 months training proggramme cum placement???????

1764


what is idealized curve for concrere and steel

1863


Is there any course for billing available in Mumbai? If yes then please mail me the details..

1816


LET ME KNOW HOW IS CALCULATE RUBBLE WALL .3'00" IN BOTTOM 1' 6" IN TOP HEIGHT 8' 0" AVERAGE. length 200'00". please give correct answer.

1613