what is the difference between 2 legged to 4 legged stirrups?

Answer Posted / munna kumar

2 legged stirrups means only one stirrups is provided at one layer and 4 legged stirrups means 2 stirrups are provided at single layer.

Is This Answer Correct ?    5 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

i am completed my b.tech EEE in 2009,,,iam trying the job 3+ for AUTO CAD (ELECTRICAL),, what is the market for autocad electrical in hyderabad... how to handle the intervws give some suggestions ?

1482


B.M DIAGRAMS & S.F DIAGRAMS OF CONTINOUS BEAMS

2533


Design a shear wall of length 4.20 m and thickness of 250mm subjected to the following forces.Assume Fck = 25Mpa and Fy = 415Mpa and the wall is a high wall with central part 3440mm x 250mm and two 380mm x 760mm strong bands at each end with following loading. S.No.       Loading        Axial force      Moment     Shear 1               DL+LL          1950              600            20 2           Seismic load       250              4800          700

1519


in the construction of residential building what type of tank are used?where?why & what is its purpose?

1903


How do you calculate the power of a centrifugal pump?

682






How cracks in concrete can be avoided?

639


CAN V USE CRUSH SAND FOR CLAY BRICK MASONARY

723


What is the bowing depth after stressing of PSC Girder of various spans and various dia of strands?

1809


please briefly explain calculating or estimating steel quantity for a RCC column?

1436


WHAT IS YOUR EXPECTED SALARY?

1620


What are the joints wants to made in masonry where door opening, arches like etc..

1278


why are you joining in this (applied post) job and your aim for this job

2115


what is relation between SPT N value and driving piles after conducting a soil test?

1575


I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

1638


what is called Bulk Density of aggregate?

1434