12 mm dia not available at site for raft, 10 mm are available at site how to calculate?
Answer Posted / vaideeswaran
T12 = 140 c/c, ( As per Dwg)
T10(site availability) = (Spacing ?)
Unit Weight of T12 = 0.888 , T10 = 0.616.
0.616/0.888 = 0.693% times lower than T12 ,
0.693 x 140 mm = 97.117 , Say = 97 mm c/c.
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
what do you understand by M25 concrete
Explain moment of inertia?
what is civil engineer greatest strength and weakness?
if i have to draw bending moment diagram of 4 way continous span then how to create it and how to find reaction?
1) What is meant by C-soil in geotechnical Engineering? 2) What is Eve board? 3) What will happen when heat is applied to cement? 4) what do you understand by the lateral dimention ?
How many Sft of Level Plaster per Kg
what is the design procedure for building
What is braced excavation all about?
For the construction project what capital cost has to be taken in consideration?
kindly mail me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates plz send my email id- VMANDAL91@gmail.com
Explain how you can turn off the display for dimension in CAD?
Why are separation membranes used between concrete pavement slab and sub-base?
Bearing capacity of soil determined as per ASTM is to design the foundation size.what is the importance of EV1/EV2 value as per DIN .My consultant ask me to test the the soil as per din to find out this ratio to assess the compacted strength of soil ,,?? is it meaning full ??
How to arrive dry volume of concrete (1.52 to 1.57) ?
How to find the cuplock pipe qty in staging for Minor bridge?