12 mm dia not available at site for raft, 10 mm are available at site how to calculate?

Answer Posted / vaideeswaran

T12 = 140 c/c, ( As per Dwg)
T10(site availability) = (Spacing ?)
Unit Weight of T12 = 0.888 , T10 = 0.616.
0.616/0.888 = 0.693% times lower than T12 ,
0.693 x 140 mm = 97.117 , Say = 97 mm c/c.

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what do you understand by M25 concrete

1932


Explain moment of inertia?

651


what is civil engineer greatest strength and weakness?

13385


if i have to draw bending moment diagram of 4 way continous span then how to create it and how to find reaction?

1510


1) What is meant by C-soil in geotechnical Engineering? 2) What is Eve board? 3) What will happen when heat is applied to cement? 4) what do you understand by the lateral dimention ?

6115






How many Sft of Level Plaster per Kg

1125


what is the design procedure for building

1769


What is braced excavation all about?

731


For the construction project what capital cost has to be taken in consideration?

678


kindly mail me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates plz send my email id- VMANDAL91@gmail.com

1409


Explain how you can turn off the display for dimension in CAD?

721


Why are separation membranes used between concrete pavement slab and sub-base?

827


Bearing capacity of soil determined as per ASTM is to design the foundation size.what is the importance of EV1/EV2 value as per DIN .My consultant ask me to test the the soil as per din to find out this ratio to assess the compacted strength of soil ,,?? is it meaning full ??

1918


How to arrive dry volume of concrete (1.52 to 1.57) ?

1907


How to find the cuplock pipe qty in staging for Minor bridge?

729