Answer Posted / bibhutibhusan0
It is the ratio between maximum to minimum.For ex.the turn down ratio of flow meter is the ratio between the maximum flow and the minimum flow to be measure .
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
How We Calibrate the vaccum transmitter?
What is difference between secondary Air & Tertiary Air and Their use.?
what is natural frequency of turbine shaft .
why is the in steam turbine axial displacement of active side thrust pad is positive and non active side thrust pad is negative.
We have Demin Closed cooling water system with expansion tank for cooling oil system. Expansion tank having N2 bladder. Whenever N2 bladder bursts out, Closed cooling water circuit pressure drops and make-up happening, eventhough there is no leaks. And how Circuit pressure drops?
some one can tell me how residual type excitation is provided through transformers to an AC generator without any battery or PMG&excitor
what does mean by kva rating
our 125 kva DG does not start in AUTO mode works normally in MANUAL mode please give me a solution.....
Qatar Fertiliser Company (QAFCO) Shortlisted me for interview (got the intel from my source) for Field Operator- Utilities post. Please let me know what kind of questions they asked? ... this position requires 5 years of experience in Power Plant and background Diploma in Electrical/ Mech. ... my Background is Electrical and I am a sub Assistant Engineer (Operation) at a private HFO based Power plant... PS: Please Let me know what preparation should I take to obtain the Interview which will be take place In Bangladesh soon
How to calculate boiler capacity? I have 1 Autoclave, Which has to use for AAC block. Dimension for this Autoclave is - 13 Meter Length & 2.2 Meter Diameter.
procedure of how to generate power in solar plant.
what is the basic use of power plant in equipment
why airtel use + 24 volts and other operators use -48 volt
how to differentiate between "ALL fuel lost" and "All Fuel Lost" in Boiler MFT condition?
By any way can we increase the B check hours from 300 to 500