Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What is full form of hart communicator?

Answer Posted / veeru

highway addressable remote transducer.

Is This Answer Correct ?    8 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

when the instrument tapping on pipe line is located below and transmitter is located above the tapping point for liquid service transmitter, what should we do, is there any additional drain valve is required??

2190


Which tank weighing system is better to install (Accuracy point of view) 1) Tank weighing system with 3 load cell or 2) Tank weighing system with 4 Load cell

1336


Calibration procedure for electro magnetic flow meter

1992


What is the purpose of the analyzer in petrochemical plant?

3880


i have done DAE in Instrumentation and Process Control. i have applied for an apprentice training in chemical company after three day my interview will be conduct but i need more information about industrial process control and controller. my e mail is imran_dilsetu@yahoo.com please tell me interview question relative to instrumentation ?

2333


i want formula for flow control.am doing project in flow control using orifice . i know value of the flow level(Q) . upstream(p1) pressure, orifice diameter(Do) , pipe diameter(Di) and oil viscosity(Vi) how can i calculate downstream pressure

1926


How vortex sensor used for steam flow measurment can be checked on line i.e without taking out from process line.

2153


Describe the typical instrumentation used in monitoring the performance of a shell and tube heat exchanger.

2085


it is possible to check the fail safe condition in pressure transmitter. if possible how?

1415


How ejector(or)evactor air pump is working in thermal power plant?

6622


how many pulses are required by a ac induction servo motor of 4 poles with 50 Hz frequency to rotate by 1 degree?

2121


Introduce yourself which is not present in your biodata?

2443


what is insdustrial vibration.who it works. give atleast 2 types of insdustrial vibration

1975


send me model hpcl questions pleas..........my mail id mohideen.dharvesh@gmail.com

2238


what is commisioning procedure,2)what is is the main work in commisioning in the field tx to dcs, plz send me detail