for 100sft of Cement plastering ratio 1:6 How much quantity
of cement and sand required.
Answer Posted / vishal singh
12mm plaster 1 beg of cement & 7 cft sand
Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
Why concrete barriers have curved surface profiles?
how can we calculate steel value, depending on load
In an aggregate blending plant, water is sprayed before blending is performed. If the fine content in aggregate is as high as 25 %, will not the fines form into lumps / balls and distribution will not be uniform ? Further, the fines will stick onto the interior of pug mill and its content will be low. The mixed material is stockpiled for weeks / months before use. Will it not be better that blending is done in dry condition, and water will be added only during compaction at site. Please forward your comments and suggestions.
What is progress payment?
for G+2 residential building how much quantity of required in foundations,sub & superstructures per sq ft area
How many mortar required for Brickwork of 1 Cu.m works??
What is the outturn of Ceiling plastering
explain the rale of the government in the construction industry
Define What is the distance between railway tracks?
i have a interlock pavement work.i need to compact about 2000 sq metres of sub base grade c of thickness 15 cm.what is the amount of water required for compaction ??
Does degree of bend of rebars has any effect on strength of the member? For example- if a beam is designed with 45 degree bent up bar with respect to architechtural needs and is not 45 in practical so will there be any reduction in the strength of member?
How can I make justification between using concrete grade c35 compare c37?
what is the water cement ratio for plastering
minimum number of bars in a beam? minimum and maximum column size and beam size ? minimum and maximum aggregate size used in multistorey residential building for columns,beams,slabs?
B.M DIAGRAMS & S.F DIAGRAMS OF CONTINOUS BEAMS