Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

if my load is not in continuous operation so what type of panel is required APFC or fixed capacitor bank without APFC

whether C.T is required in both cases compulsory? explain detail

Answer Posted / nileshingale

if my load is not in continuous operation so what type of panel is required APFC or fixed capacitor bank without APFC whether C.T is required in both cases compulsory? explain detail

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What about electrical Units. discrive in detail

2103


Which standard we are following earthing resistance test

1422


How can we checked Killo Watts of Motor & Alternator?

2164


what is the safe meggar values for motor, transformer HT, LT and Cables? IF we want to replace I/C bay at our 220 kv substation which is of 140 mw load capacity bay to be replaced by 400 mw capacity bay.other than CT(1200/1) what are the other equipment i have to replace. why we generally use 3.5 core cable or in other word 1/2 core for neutral and also confirm me that in balance conditiob(3 phase)current in neutral will zero

2280


why the earth is taken minimum in supplying? wather it the proportional factor to getting work any equipment or a power plant?

1899


what is the meaning of 5% droop or 7% droop in AVR?

2328


Why line VTG = √3 phase VTG in star? How?

1625


Iin ESP why positive is grounded ? why not negative ?

2672


A generating system will have a total capacity of 300 MW. Find the probable forced outage when the capacity is supplied by two 150 MW units. The operating probability of all units is P=0.98 and forced outage probability rate Q =0.02 .

2644


Why generation voltage in thermal power plant is between 11kv to 33kv?

1035


types of central Air conditioner plant?

2174


How can eliminate noise problem inside temperature controller temp. variation due to contactor chattering problem.

1635


What is the end effect of linear induction motor ??

2031


What is the equivalent circuit of a transformer and its vector diagram?

2694


Dyn1 transformer vector group testing how to do

1807