Answer Posted / nawan
As per the Process:
1.Bearing Piles
2.Friction Piles,
3.Sheet Piles
4.Displacement piles
As per the Material
1.Wooden Piles
2.Cast in Situ Piles
3.Pre Cast Piles
4.Steel Piles
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
dialation means
it is a corrected question." make a list of engineering property(properties) of soil.
Can anyone suggest how to determine scheduling of reinforcement of floor beams from Staad model,other than clicking each beam respectively 7 noting down the values ?
Explain the difference between shear and tensile strength.
How to calculate or what is the process of calculation for making 1Metre squre area by AAC Blok which quantity of Cement, Sand & Chips are to be required?
Explain what is progress payment?
types of survey and levelling instrument ?
How to find coloumn vertical cut length floor to floor & lap + bend or anything plz clearfiy
For 1 bag cement how i will calculate sand and metal aggregate;Here the mix proportion is 1:2.49:2.38
How many litres of water used for curing of 1000sqft of slav
Dear Frds, How can i calculate the Steel for RCC Slab, Please provide one Example also, so that i can understand very well. Ex: Area: 1320.0 Sft.(44' X 30') Span: 15'(Default). Column Size: 9"X15"(6 No.s 12mm Rods) Please Provide Calculation Details. Thankyou. Satish
Advantage of Aluminum form work in terms of activities can be skip and cost too
how to calculate quantity of bricks in circular manhole with examples.
What is difference between engineering stress and true stress?
What is the primary difference between adsorption and absorption?