why curing is necessary?

Answer Posted / rashid

After casting concrete have chemical reaction which generate heat. To prevent hydration concrete being cured 7 days to get strength.

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what does the track parameter mean in staad.pro?

5460


how to calcualate the amount of stone,cement,sand required for 1cum of 450mm thick ruble stond masonary with ratio1:5, please me an answer with dtailed step

1647


What is meant by solid geometry?

647


What is different between DI Pipe and CI pipe?

1584


How to do bbs in excel format

1594






cud any one send me tech quest paper(civil engg) at tarizus@yahoo.com

1744


Rate analysis of Vitrified tile in cement mortor 1:3

3936


What is the compressive strength of fly ash bricks?

695


Exterior Joints,define

1534


How do You Maintain a structure after getting cube test of low strength.

1827


Anyone have sample questions for bhel interview.please send me as Iam appearing for the interview on 19th sep2008. Kindly send this to my e-mail: arun_prasath_n@yahoo.co.in

1600


the water is flowing through a velocity of 1.5m/s in a pipe of length 2500m and dia 500mm. at the end of pipe a valve is provided. find rise in pressure 1. if the valve is closed in 5 seconds. 2. if the valve is closed instantaneously. take value of c = 1460m/s, pipe to be rigid and bulk modulus of water - 19.692x10' n/sqcm

1890


what is civil all interview questions

2076


weight of 1 cft 10mm, 20mm, 40mm aggregate weight of 1cft course sand

4582


Explain the difference between shear and tensile strength.

662