CM 1:4 !:5..what CM stands for??
and what is standard ratio used for external plaster??
Answer Posted / ansar khan
plaster on rcc 1:4 and plastar on brick work 1:6
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
rate analysis for cement pointing 1:4 , for 100 sq m
what is the theoritical percentage of concrete cubes testing per day?
What is a kip?
Technical Question of Civil Engineering
What is a tensile strength? What is the tensile strength of wood?
What are the different methods for drawing an arc?
I am called for interview from north east power plant .so, I need some interview question which may help me.
if in column reinforcement lower dia connect to higher dia then from wher we want to start higher dia steel
I measured pcc work as 15.34 m cube , the ratio is 1:5:10 ,want to know the cement, sand and metal used for pcc measured as 15.34 m cube at this ratio.
what is the difference between tsp & tower
How to find out slope footing concrete
what is the meaning of degreasing of the euipment or line.
what is the cost of rcc roof casting of 400 sq. ft. in kolkata
3. A vane 12.5 cm long, 8.8 cm dia was pressed into a soft clay at the bottom of borehole. Torque was applied and the value at failure was 55 N-m. find the shear strength of the clay on a horizontal plane.
04. a. Slenderness ratio…………… 1 b. If the height of a stage is 15-0 & dia. of the prop is 5, the slenderness ratio is….… 1 c. If the height of a stage is 10-0 & dia of prop is 3, the number of bracing will be…… 1