Answer Posted / ibrahim
meaning of TBM is Temporary Bench Mark and also another Meaning of TBM is Tunnel Boring Machine
ex:- TBM = 100m It's mean Temporary Bench Mark
TBM Site Engineer or like this meaning Tunnel Boring Machine Site Engineer
Is This Answer Correct ? | 16 Yes | 1 No |
Post New Answer View All Answers
I'm preparing to to build a simple house, but i don't know how to calculate how much cement, gravel and sand and hollow blocks i need to prepare. How many pcs of 4" or 6" hollow blocks I need for my planned 3mx6m house? thanks.
Which ratio use for cement selery???
What is the use of water table & Kreb stone for drain
What is the density of 1:1.5 (Cement:sand) ratio in plaster? And Conversion in 12.5 mm thickness per square meter? Howmany Kg of Cement square meter in ratio of 1:1.5?
how to calculate the size of triangular ring in rcc column?
how to absorb to site basic corrections? which are the important correction?
Define What is the difference between routing maintenance and major maintenance in school facilities?
Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?
what is the weight of 10mm,20mm,40mm aggregate
how to calculate the material from ratio of work PCC, RRM,POINTING, RCC
How can we convert weight batch to volume batch for m30 mix
IS STEEL BARS IS AS PER ISI TRANSVERSE RIBS SHOULD BE UNIFORM IN DISTANCE, PLEASE EXPLAIN WHY,
Describe Briefly The Various Methods Of Concrete Curing?
how many BSCs can i connect to the HUAWEI MSC
150mm bricks size how many use 4.14 m3