How to layout the site plot ? Method with explation

Answer Posted / muhammad sami

If we are using total station so we use stake out mathod
But manual by meter first we make right angel of building and fix the three points of building and after measures dimensions for grid line from fix points

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Kindly post me previous year interview questions with answer for post of Manager (civil engg.) for NTPC, IOC , GAIL etc. I have interview on july 2013.I will be very grateful to you. Please guide me.

1784


Explain the advantages and disadvantages of using plastic and timber fenders?

708


How to build the floor to ceiling bookcase?

820


Rate analysis of Vitrified tile in cement mortor 1:3

3933


why does the most of civil engg is not intersted to going for teaching field?

1605






que.is ideal size of bricnk use in india,joint size of mortar in massinary ,how many bricks used in 1cum.how to test at site.what is the possition of marka used in bricks?

2021


What is the difference between engineering stress and true stress?

648


In the present situation of ban on mining sand from rivers,can we go for formation of earth dam filters viz;Horizantal sand blanket,inclined chimney and filters under rivetment with crushed rock sand of 6mm down size.If so what are the specifications and is there any codal provision for its authentication?

1495


For sloping slabs or sloping beams why the tension steel from either side of ridge is taken into compression zone of other side?

1629


What is the standard specification of MOR and Water Absorption of Homogenous Ceramic Floor Tiles?

1769


The portion of a brick cut across the width is called?

958


How to calculate canal slope curvature qty!

1323


design the irrigation canal(b,B,h )head is 3tms of water is supplied to the 200hectars of area and the base period crop is 150days dance to water travels as 35km.the canal section is trapezoidal and also calculate the slop the canal

1791


hai, kindly send anyone for output workers format details for construction project in foundation to finishing.

1064


Explain what is change order request?

675