Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Meaning of civil engg. in hindi

Answer Posted / karan

Janpadiy abhiyantriki

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

In jack arch floor, the rise is kept?

1182


Why we provide hair pin for shed

2386


Why steel rods are produced only in even dimensions?

2656


sir when can we expect the AEE results and when will be the interviews sheduled please guide us in this regard thanking you

2467


What is the cost of shuttering per Sqm.? How it is calculate by thumb rule...?

1992


I am doing a engineering contract with GOI. I have purchased certain material from outside Maharashtra and paid CST on that material @ 5.25%. Please intimate whether I will be liable for VAT or VAT on works contract or not.

2047


In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.

2280


when it is noted "JAMB SIM" what is the term "SIM" and what does it mean?

2599


GIVE US YOUR FULL DETAIL OF THE FOLLOWING… FULL NAME.. PERMENENT MAILING ADDRESS DIRECT CONTACT NO E MAIL ADDRES.

2489


WHAT IS THE CAUSES OF RUTTING ON FLEXIBLE PAVEMENT?

3245


pls give me ans to ACT formula cube testing porpuse

3094


What is kn measurement?

1284


Cut Linten (RCC-1:2:4)on 10" wall - what should be the width and hight of cut Linten? Secondly, 1 X 1.6 foot,4" thick window sun/rain shed (Chajja)should consume steel,Cement, sand and Stone chips?

2544


cud any one send me tech quest paper(civil engg) at tarizus@yahoo.com

2197


Scaffolding IS code NO.

2272